The build, without the mystery · South East QLD

From site visit
to first swim.

Twelve clear stages from the first site consultation to pool handover.

12 clear stages

Watch your pool take shape.

Each stage resolves a different part of the design, approval, structure, finish and handover.

01

Start with the site

Walk the property, discuss how the pool will be used and identify access, slope, structures and drainage.
↗
02

Shape the pool around the home

Set the size, position, entry points, benches and dimensions around the block rather than a catalogue shell.
↗
03

Make the scope clear

Confirm inclusions, equipment, interior direction and surrounding works so the quote reflects the intended build.
↗
04

Engineering & council approval

Coordinate structural engineering, certification and the relevant council or building-approval pathway before construction.
↗
05

Mark the pool on the block

Set out the approved footprint so position, levels and clearances can be checked before excavation.
↗
06

Excavate the shell

Cut the pool shape into the block and establish depths, steps and bench zones.
↗
07

Steel it. Plumb it.

Form the reinforcement and position plumbing, returns, suction, lighting and other services.
↗
08

Form the concrete pool

Concrete the reinforced shell to create the permanent pool structure.
↗
09

Connect the working parts

Install filtration, pumps, sanitation, lighting and electrical services.
↗
10

Tiling, pool fence & final certification

Complete coping, tiling and surrounds, install the compliant pool fence and obtain final barrier certification before filling.
↗
11

Interior installation

Apply the selected interior, fill the pool, balance the water and commission the system.
↗
12

Hand over the backyard

Complete final checks and explain the equipment, sanitation and day-to-day operation.
↗
Have a block in mind?

Send the address and a few photos. We’ll start there.

CallPlan your pool